|

New power plant helped exceed Shenzhen power capacity to a new level

New power plant helped exceed Shenzhen power capacity to a new levelWith the second phase of the first reactor Shenzhen Ling’ao Nuclear power plant began operation yesterday, China power generation capacity exceeded 900 million kilowatts. The director for the National  Development and reform commission Zhang Ping said China have entered a new stage of development for the China power industry.

Zhang said it took China 38 years to raise power generation capacity, from 100 million kilowatts in 1987, far from the 1.85 million kilowatts when China only generating in 1949. In 2005 China electric generation capacity was at 500 million kilowatts. China also has the largest hydro power capacity in the range 200 million kilowatts and 22 million kilowatts of wind power capacity.

China plans to raise its nuclear power capacity to 60 million kilowatts by the year 2020, when its six nuclear power plants will be able to produce 10 million kilowatts of capacity.



1 Comment for “New power plant helped exceed Shenzhen power capacity to a new level”

  1. I absolutely agree with your view on this, I just wish more people had the same perspective.

Comments are closed

The Contributor

Follow me on twitter: TriaSasin

    Connect with Jasmin:
  1. - Email: Click here

Have Your Say!

Which part of Shenzhen has the best quality of life for foreigners?

View Results

Loading ... Loading ...

  1. Etienne Ducrot: Hi, I’m interested to contact this Foundation. Do you know how? Thanks. Etienne
  2. Emma: Hi Jasmin, I’ve read your article about a new medical center opens in Nanshan at the end of this month....
  3. sherry lee: A simple story with great words…I love it.
  4. Evangeline: Awesome piece!
  5. Glenda: Hi there, I enjoy reading through your article post. I wanted to write a little comment to support you.