White Horse Laboratories Week 9 Quality Report

White Horse Laboratories Week 9 Quality ReportPhysical Inspection – 76% Accepted Electrical Testing – 61% Passed

In the 9th week of 2011, White Horse facilitated USD93,855.00 in reliable component purchases.

Week 9 saw more lower overall quality levels, with decreases in both mechanical/visual and electrical test results, reflecting the continued trend in substandard discrete devices.

  • Globespan GS2237-208-001PC1, 30% failure (Date Code 0049) - open/short pins and bad protection diodes.
  • Infineon TLE5206-2G, 100% failure (Date Code 0829) – 28% flagged EF pin, 30% with one channel having no output, and 42% with pulled down output.
  • Panasonic ECJ1VB1A105K, 15% failure (Date Code 1035) - low capacitance.
  • Altera EPM7064LC84-15, 100% failure (Date Code 0607) – ID error.
  • Bourns TISP4070M3BJR-S, 100% failure (Date Code 038) - high, breakover voltage, Vbo, above 88V.
  • Vishay SFH6943-3, 43% failure (Date Code 0541) – high LED and collector to emitter leakage current, high forward voltage, Vf, and low CTR.
  • AVX TPSD477M006R0045, 100% failure (Date Code 1041) – high equivalent series resistance, ESR.

Infineon BSP372L6327, 100 failure (Date Code 1037) – high on-state drain-source resistance, Rds(on).

Quality drives a company’s reputation, its bottom line and, above all, its value.

Contact our Quality Consultants to discuss a Quality Assurance Program that will improve your bottom line

Comments are closed

The Contributor

Have Your Say!

Where is your favorite holiday destination in SEA?

View Results

Loading ... Loading ...

  1. Etienne Ducrot: Hi, I’m interested to contact this Foundation. Do you know how? Thanks. Etienne
  2. Emma: Hi Jasmin, I’ve read your article about a new medical center opens in Nanshan at the end of this month....
  3. sherry lee: A simple story with great words…I love it.
  4. Evangeline: Awesome piece!
  5. Glenda: Hi there, I enjoy reading through your article post. I wanted to write a little comment to support you.