|

White Horse Laboratories Week 39 and 40 Counterfeit Detection Report

White Horse Laboratories Week 39 and 40 Counterfeit ReportDue to the Mid-Autumn/National Day holiday, White Horse’s lab was closed during Week 40, so weeks 39 and 40 are combined for this report.

Inspection results dipped slightly to 60.7% in Week 39 from Week 38′s 61% buyer acceptance rating.

Electrical testing yields dipped from Week 38′s sizzling 94% to nearly 83% in Week 39.

Inspection: 60.7% Accept  Testing: 82.6% Pass

Week 39&40 Quality Report, 2012  Substandard Part Listing

On Semiconductor  CAT28C16AW-20T (Date Code 0120) – 9% failure – Program & verify error.

CSI CAT28F010GI-12 (Date Code 0829) – 11% failure – program & verify error.

Zilog Z86E3016PSG (Date Code not marked or labeled) – 72% failure- Blank-check error.

Maxim DS17287-5+  – 5% failure- program & verify error

 



Comments are closed

The Contributor

Have Your Say!

Which part of Shenzhen has the best quality of life for foreigners?

View Results

Loading ... Loading ...

  1. Etienne Ducrot: Hi, I’m interested to contact this Foundation. Do you know how? Thanks. Etienne
  2. Emma: Hi Jasmin, I’ve read your article about a new medical center opens in Nanshan at the end of this month....
  3. sherry lee: A simple story with great words…I love it.
  4. Evangeline: Awesome piece!
  5. Glenda: Hi there, I enjoy reading through your article post. I wanted to write a little comment to support you.