|

White Horse Laboratories Counterfeit Detection Report Week 51

White Horse Laboratories Counterfeit Detection Report Week 51Like Weeks 49 and 50, Week 51 resulted in reversing direction in both Inspection andf Electrical Testing yields from Week 49 to 50 and 50 to 51.

Inspection yields dropped to a season-low 47.4% in Week 51 after recovering to 55% in Week 50 from Week 49′s 50%.

Similarly, Electrical Testing yields climbed to a month-high 71.4% in Week 51 from 61.9% in Week 50, after having fallen from 68.8% in Week 49.

With December having turned into a roller coaster, where do you think Week 52 will land?

Inspection Accept 47.4%  Electrical Testing Pass 71.4%

Week 51 Quality Report, 2012 Substandard Part Listing

ST Microelectronics UPSD3233BV-24T6 (Date Code 0624) – 100% Failure Rate - Program and verify error.

Bourns TISP4180H3BJR-S (Date Code 0233) - 5% Failure Rate - High Idrm and Id.

Allegro Microsystems A4982SETTR-T(Date Codes 0919, 1037, 1039, and 1043) - 44% Failure Rate - Uncharacteristic outputs.

Cirrus Logic CS5504BSZ (Date Codes 0507, 0518, 9621, 9749, 9809, and 9951) – 7.5% Failure Rate - Pin DRDY doesn’t go Low after starting conversion.

Cirrus Logic CS5504BS (Date Code 0505) – 100% Failure Rate – Pin DRDY doesn’t go Low after starting conversion.

Texas Instruments  4127KG (Date Code not marked or labeled) - 7.25% Failure Rate – Signal distortion and static outputs.



Comments are closed

The Contributor

Have Your Say!

Which part of Shenzhen has the best quality of life for foreigners?

View Results

Loading ... Loading ...

  1. Etienne Ducrot: Hi, I’m interested to contact this Foundation. Do you know how? Thanks. Etienne
  2. Emma: Hi Jasmin, I’ve read your article about a new medical center opens in Nanshan at the end of this month....
  3. sherry lee: A simple story with great words…I love it.
  4. Evangeline: Awesome piece!
  5. Glenda: Hi there, I enjoy reading through your article post. I wanted to write a little comment to support you.