White Horse Laboratories Week 1 Counterfeit Detection Report

White Horse Laboratories Week 1 Counterfeit Detection ReportWeek 1 Summary

In the first week of 2013 started off the right way with improvements in yields across the board.

Inspection yields climbed again from 50% in Week 52 to 56% to start of 2013. Electrical Testing yields climbed even further to 79% lot acceptance in Week 1 after dropping to 57% to end 2012. See below for Week 52′s substandard part listing (devices with higher than 5% failure rate in Electrical Testing).

Inspection Accept 56%   Electrical Testing Pass 79%

Week 1 Quality Report, 2012  Substandard Part Listing

Philips PDI1394L21BE  (Date Code not marked or labeled) – 9.09% Failure Rate - Short pins and bad protective diodes.

Philips  BLW60C (Date Code not marked or labeled) - 13.33% Failure Rate - High Hfe.

Texas instruments SN65LVDS100DGK(Date Code not marked or labeled) - 72.73% Failure Rate - Wrong open reading on all pins.




Comments are closed

The Contributor

    Connect with Mark:
  1. - Email: Click here

Have Your Say!

Where is your favorite holiday destination in SEA?

View Results

Loading ... Loading ...

  1. Etienne Ducrot: Hi, I’m interested to contact this Foundation. Do you know how? Thanks. Etienne
  2. Emma: Hi Jasmin, I’ve read your article about a new medical center opens in Nanshan at the end of this month....
  3. sherry lee: A simple story with great words…I love it.
  4. Evangeline: Awesome piece!
  5. Glenda: Hi there, I enjoy reading through your article post. I wanted to write a little comment to support you.