|

White Horse Laboratories Quality Report, Week 2

White Horse Laboratories Quality Report, Week 2The second week of 2013 resulted like much of 2012 with Inspection and Testing yields going in opposite directions.

Inspection yields climbed to 67% in Week 2 from 56% in Week 1, the second straight week of gains. Electrical Testing, however, dipped to 75% from Week 1′s 79% lot acceptance rate.

 

Inspection Accept 67% Electrical Testing Pass 75%

 

Week 2 Quality Report Substandard Part Listing

Linear Technology LT1490IS8#PBF (Date Code 0921) – 100% Failure Rate - Low and inconsistent outputs.

Texas Instruments TPS5450DDAR (Date Code not marked or labeled) – 100% Failure Rate

- Short circuits and no output.

ON Semiconductor SZ1SMA5935BT3G (Date Code 238) – 54% Failure Rate – High Vz.

Xilinx XC4005E-4PQ100I (Date Code 1041) Р7% Failure Rate - Bitstream data could not be loaded through PROM or JTAG.

 



Comments are closed

The Contributor

Have Your Say!

Which part of Shenzhen has the best quality of life for foreigners?

View Results

Loading ... Loading ...

  1. Etienne Ducrot: Hi, I’m interested to contact this Foundation. Do you know how? Thanks. Etienne
  2. Emma: Hi Jasmin, I’ve read your article about a new medical center opens in Nanshan at the end of this month....
  3. sherry lee: A simple story with great words…I love it.
  4. Evangeline: Awesome piece!
  5. Glenda: Hi there, I enjoy reading through your article post. I wanted to write a little comment to support you.