Both Inspection and Electrical Testing yields receeded in Week 46 Buyer acceptance following Inspection results slid to 81.8% from Week 45′s 82.4% while Electrical Testing yields dipped to 75% after having reached 82.4% in Week 45. Inspection Accept 81.8% Testing Pass 75% Substandard Part Listing Vishay 594D337X9016R2T - (Date Code not marked or labeled) – 8% Failure - breakdown [...]
Dec 17 2012, 7:34 am | Posted in Quality Control | Read More »

Some exciting news in Week 45 with both Inspection and Electrical Testing yields making sharp jumps with buyer acceptance following Inspection jumping to 82.4% in Week 45, up from 52.4% in Week 44. Electrical Testing gained for the third straight week, up to 81.8% in Week 45, climbing from 73.1% in Week 44 and up over [...]
Dec 13 2012, 7:39 am | Posted in Quality Control | Read More »

Greetings! The holidays are finally arriving, and it is one that most of the rest of the world enjoys with the exception of China but still has a remarkable effect on everyone’s disposition! Our Hong Kong operation, where Christmas is a recognized holiday, will be closed on Christmas Day and Boxing Day, the 25th and 26th [...]
Dec 12 2012, 9:33 am | Posted in Quality Control | Read More »

Inspection results dropped back down to 70% in Week 42 after reading 76.7% buyer acceptance in Week 41. Remarked and resurfaced parts continue to plague buyers. Electrical testing yields also dipped in Week 42, dropping over 20 full points from 85% in Week 41 to 64.7% in Week 42. Inspection: 70% Accept Testing: 64.7% Pass Week [...]
Oct 24 2012, 7:36 am | Posted in Quality Control | Read More »

Just a reminder that Hong Kong will be closed on Tuesday, October 23rd, for the Chung Yueng Festival. We will be open on Monday, October 22, and will resume normal operations on Wednesday, October 24. The Chung Yueng Festival is similar to May’s Qing Ming Festival, a time for honoring ancestors by visiting burial sites. [...]
Oct 22 2012, 11:13 am | Posted in Quality Control | Read More »

Inspection results climbed back to 76.7% buyer acceptance in Week 41 after suffering a slump to 60.7% in Week 39. Electrical testing yields also recovered to 85% in Week 41, coming back from Week 39′s 83%, after setting a sizzling 94% in Week 38. Inspection 76.7% Accept Testing 85% Pass Week 41 Quality Report, 2012 Substandard Part Listing Motorola MC68705P3CS (Date Code [...]
Oct 19 2012, 8:39 am | Posted in Quality Control | Read More »

Due to the Mid-Autumn/National Day holiday, White Horse’s lab was closed during Week 40, so weeks 39 and 40 are combined for this report. Inspection results dipped slightly to 60.7% in Week 39 from Week 38′s 61% buyer acceptance rating. Electrical testing yields dipped from Week 38′s sizzling 94% to nearly 83% in Week 39. Inspection: 60.7% [...]
Oct 17 2012, 8:31 am | Posted in Quality Control | Read More »

Inspection results recovered to a 61% buyer acceptance rating in Week 38 following the first drop in 5 weeks with a 54.6% acceptance rate in Week 37. Electrical testing yields climbed again in Week 38 to nearly 94% after Week 37′s 75%. The suspect part list is understandably short, then, as only one device had [...]
Oct 1 2012, 9:35 am | Posted in Quality Control | Read More »

Inspection results could not maintain a fifith consecutive week of improved yields as buyer acceptance dropped from Week 36′s high of 92% back to a humbling 54.6% in Week 37. Electrical testing yields, however, recovered to 75% in Week 37 after having tumbled to just over 64% in Week 36. A broader range of devices were seen [...]
Sep 24 2012, 7:33 am | Posted in Quality Control | Read More »

The autumn season is rapidly approaching, which means the Mid Autumn Festival/National Day Holiday is nearly upon us. Our Hong Kong and Shenzhen facilities do have different schedules for the holiday so please plan and schedule accordingly to avoid any unplanned interruptions. As always, White Horse will have a core team of Engineers on-duty to respond [...]
Sep 21 2012, 7:37 am | Posted in Quality Control | Read More »